
Permian Basin UIC Permitting Update
Reading Time: 2 minutesPeriod: August 19 – October 13, 2025 Permitting activity across the Permian Basin continues to adjust to the Railroad Commission of Texas’s new pressure-first permitting

Reading Time: 2 minutesPeriod: August 19 – October 13, 2025 Permitting activity across the Permian Basin continues to adjust to the Railroad Commission of Texas’s new pressure-first permitting

Reading Time: 3 minutesOctober 2025 B3 Insight has released a new wave of data enhancements to the OilfieldH2O platform—delivering expanded coverage, deeper subsurface visibility, and smarter operational context

Reading Time: 2 minutes7 Key Takeaways from DUG Permian 2025 By Patrick Patton, VP of Products, B3 Insight “Never underestimate the American engineer.” That single line—spoken on stage

Reading Time: 2 minutesPermian disposal bottlenecks are reshaping field strategies, but advances in treatment and reuse are opening new pathways for cost control and resilience. As disposal pressures

Reading Time: 2 minutesA new B3 Insight case study shows how one leading Permian Basin midstream operator used data-driven pressure intelligence to streamline permitting, strengthen planning, and reduce

Reading Time: 4 minutesManaging the Byproduct That Now Constrains U.S. Shale Growth This article is a summarized and edited version of a piece originally written by Pat Patton,